DOE Announces $500 Million to Build a Safe and Reliable Carbon Dioxide Transportation System
May 3, 2024

Funding from President Biden’s Investing in America agenda will provide transport infrastructure needed to support future growth of the carbon capture and storage industry

WASHINGTON, D.C. — As part of President Biden’s Investing in America agenda, the U.S. Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management (FECM) today announced up to $500 million available for projects that will help expand carbon dioxide (CO2) transportation infrastructure to help reduce CO2 emissions across the United States. Meeting the Biden-Harris Administration’s goal of a net-zero emissions economy by mid-century will require accelerating the responsible development and deployment of technology to capture CO2 emissions from industrial operations and power generation and to remove CO2 directly from the atmosphere. These efforts must be supported by a safe and reliable system that can transport the captured CO2, either for permanent geologic storage or for conversion to useful, durable products.

 

“To successfully achieve our climate goals, it is critical to ensure that we have adequate infrastructure in place to accommodate the growing volumes of carbon dioxide over the next 25 years that we must capture from industrial facilities, power plants, and future direct air capture projects and then transport to geologic formations for permanent storage,” said Brad Crabtree, Assistant Secretary of Fossil Energy and Carbon Management. “Making investments in additional transportation capacity now allows us to plan ahead for future growth and take advantage of economies of scale, resulting in significant monetary and environmental benefits by avoiding unnecessary future construction of separate, redundant transport networks.”


America’s carbon transport system is already of significant scale—including multiple methods such as pipelines, trucks, and freight that together transport almost 60 million metric tons of CO2 per year. The United States will likely need to capture and permanently store approximately 400–1,800 million tonnes of CO2 annually to meet its net-zero commitments by 2050. To accommodate the rapid growth of carbon capture and storage industry, we must significantly expand the infrastructure to transport carbon dioxide over the next decade.


Carbon Dioxide Transportation Infrastructure Finance and Innovation Future Growth Grants


This funding opportunity announcement (FOA) will provide future growth grants under DOE’s Carbon Dioxide Transportation Infrastructure Finance and Innovation (CIFIA) program, made available through the Bipartisan Infrastructure Law. Future growth grants are intended to provide financial assistance for designing, developing, and building CO2 transport capacity up front that will then be available for future carbon capture and direct air capture facilities as they are developed and for additional CO2 storage and/or conversion sites as they come into operation. 


Under this FOA, the transport system—which may include pipelines, rail, trucks, barges, and/or ships—must connect, either directly or indirectly, two or more CO2 emitting sources to one or more conversion sites or secure geologic storage facilities. DOE is interested in projects sited in different regions that will provide increased understanding of varying CO2 transport costs, transport modes, and transport network configurations, as well as technical, regulatory, and commercial considerations. This information will help inform DOE’s research and development strategy and to encourage commercial-scale deployment of carbon capture and storage and COremoval.


Read more details about this FOA here. All questions must be submitted through FedConnect; register here for an account. The application deadline is July 30, 2024 at 5:00 p.m. ET.


Societal Considerations and Impacts


In alignment with the Biden-Harris Administration’s commitment to advance environmental justice and equity, funding applicants must carefully address the societal considerations and impacts of their proposed projects, emphasizing early and active engagement with communities. Applicants must explain how projects are expected to deliver economic and environmental benefits and mitigate impacts; conduct community and stakeholder engagement; incorporate diversity, equity, inclusion, and accessibility; and promote workforce development and quality jobs. Projects selected under this opportunity will be required to develop and implement strategies to ensure strong community and worker benefits, and report on such activities and outcomes.


DOE’s Advancement of Carbon Dioxide Transport and Storage


Since January 2021, FECM has announced more than $842 million in project investments that advance research, development, and deployment of carbon transport and storage. This progress is essential to help drive economic development, technological innovation, and high-wage jobs as we build a clean energy and industrial economy.

FECM minimizes environmental and climate impacts of fossil fuels and industrial processes while working to achieve net-zero emissions across the U.S economy. Priority areas of technology work include carbon capture, carbon conversion, carbon dioxide removal, carbon dioxide transport and storage, hydrogen production with carbon management, methane emissions reduction, and critical minerals production. To learn more, visit the FECM websitesign up for FECM news announcements, and visit the National Energy Technology Laboratory website

May 21, 2026
TORONTO, May 21, 2026 - VVC Exploration Corporation, dba VVC Resources (“VVC” or the “Company”) (TSX-V: VVC and OTCQB: VVCVF) is providing an update to its previous news release dated May 16, 2026, regarding the status of its annual financial filings. The Ontario Securities Commission (the "OSC") has notified the Company that its application for a Management Cease Trade Order ("MCTO") has been rejected. In delivering its decision, the OSC noted that they are not of the view that there is an active, liquid market for the issuer’s securities, based on a review of the trade volume, trade value, and number of trades over the last month. Consequently, the OSC intends to issue a Failure-to-File Cease Trade Order ("FFCTO") against the Company shortly after the regulatory deadline if the continuous disclosure documents are not submitted. The Company's audited annual financial statements, management's discussion and analysis, and related officer certifications for the fiscal year ended January 31, 2026 (collectively, the "Required Filings") are due on June 1, 2026. Reason for Anticipated Delay The delay in completing VVC’s Required Filings is primarily attributable to the time required to complete the valuation and related accounting assessment of VVC’s equity investment in Cyber Apps Solutions Corp. (“CYRB”) and its operating subsidiary, Proton Green, LLC. The complexity of the valuation process and the resolution of related accounting matters delayed the commencement of VVC’s Required Filings. The Company also wishes to clarify that the references to executive management vacancies at CYRB included in the May 16, 2026 announcement were incorrect and have been retracted. Financing & Corporate Update In light of the operational adjustments required by the developments at CYRB, the Company also announces that it is actively pursuing capital-raising initiatives to protect working capital and fund ongoing operations, including its core helium and gold exploration assets. VVC is currently evaluating various financing options, which may include a proposed non-brokered private placement of securities. Any such financing remains subject to compliance with the strict terms of the proposed MCTO, which prohibits the issuance or acquisition of securities from any director, officer, or insider of VVC during the period of the default. Further details regarding the terms, pricing, and closing dates of any such financing will be announced if and when they are finalized. There can be no assurance that any financing will be completed on terms acceptable to the Company, or at all. Anticipated Completion and Impact of Order The Company and its independent third-party valuation specialist are working diligently to resolve the valuation framework with MNP LLP. VVC continues to target the completion and submission of the Required Filings on or before June 30, 2026. If an FFCTO is issued by the principal regulator, trading in the common shares of VVC will be suspended across all trading platforms in Canada, including the TSX Venture Exchange, until the Required Filings are completed and the order is formally revoked by the regulators. Insider Trading Restrictions The Company's internal insider trading blackout notice issued by the Corporate Secretary remains in full effect. All directors, officers, and insiders are strictly prohibited from trading in the Company's securities or exercising stock options until the default is fully remedied and the Required Filings are publicly available. About VVC Resources VVC engages in the exploration, development, and management of natural resources - specializing in scarce and increasingly valuable materials needed to meet the growing, high-tech demands of industries such as manufacturing, technology, medicine, space travel, and the expanding green economy. Our portfolio includes a diverse set of multi-asset, high-growth projects, comprising: Helium & industrial gas production in western U.S.; Gold & associated metals operations in northern Mexico; and Strategic investments in carbon sequestration and other green energy technologies. VVC is a Canada-based, publicly-traded company on the TSXV (TSX-V:VVC). To learn more, visit our website at: www.vvcresources.com. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
April 20, 2026
TORONTO, April 20, 2026 - VVC Exploration Corporation, dba VVC Resources, (“VVC”), (TSX-V:VVC and OTCQC:VVCVF) announces the following: Option Grant The Directors granted incentive stock options under its stock option plan, to officers, directors and consultants of the Company, to purchase up to an aggregate of 14,750,000 common shares, representing 2.58% of the outstanding shares of the Company. The stock options are exercisable at a price of CA$0.05 per share expiring April 20, 2036. Twenty five percent (25%) of the options granted will vest immediately with the remaining vesting at 25% every six months. The exercise price was fixed at the minimum allowable price by the TSX Venture Exchange policies. The options, granted in accordance with the provisions of the Company's stock option plan, are subject to the TSX Venture Exchange policies and the applicable securities laws. Of the Options granted, 32.2% were to Directors, 37.3% to Officers, 18.6% to Employees and 11.9% to Consultants of the Company.  About VVC Resources VVC engages in the exploration, development, and management of natural resources - specializing in scarce and increasingly valuable materials needed to meet the growing, high-tech demands of industries such as manufacturing, technology, medicine, space travel, and the expanding green economy. Our portfolio includes a diverse set of multi-asset, high-growth projects, comprising: Helium & industrial gas production in western U.S.; Gold & associated metals operations in northern Mexico; and Strategic investments in carbon sequestration and other green energy technologies. VVC is a Canada-based, publicly-traded company on the TSXV (TSX-V:VVC). To learn more, visit our website at: www.vvcresources.com. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Show More >